JUDE LANE over EIGHT MILE RIVER

475 FT W OF I-84 · County 003, Connecticut · Built 1980 · 2 Lanes · 4,700 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
06165
Year Built
1980
Length
8.1 m (26.6 ft)
Max Span
3.6 m
Lanes
2
Daily Traffic
4,700
Material
Steel
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.