ROUTE 229 over INTERSTATE-84

AT INTERSTATE-84 EXIT 31 · County 003, Connecticut · Built 1963 · 4 Lanes · 16,300 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
01242
Year Built
1963
Reconstructed
1990
Length
124.9 m (409.8 ft)
Max Span
35.8 m
Width
20.3 m (66.6 ft)
Lanes
4
Daily Traffic
16,300
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.