JUDE LANE over INTERSTATE-84

0.4 MI W OF I-84 EXIT 31 · County 003, Connecticut · Built 1963 · 2 Lanes · 4,700 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
01241
Year Built
1963
Reconstructed
1994
Length
64.9 m (212.9 ft)
Max Span
31.4 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
4,700
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.