ROUTE 322 over TEN MILE RIVER
210 FT E OF ROUTE 10 · County 003, Connecticut · Built 1989 · 3 Lanes · 9,500 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
4
Poor
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 4 | Poor |
| Substructure | 6 | Satisfactory |
Location
41.564844, -72.890097
This bridge is in worse condition than 97.1% of bridges in County 003. The average bridge in Connecticut is 0 years old; this one is 37 years old.
Nearby Bridges
ROUTE 10 over TEN MILE RIVER
Built 1936
ROUTE 10 over ROUTE 322
Built 1936
OLD TURNPIKE ROAD over TEN MILE RIVER
Built 1954
OLD TURNPIKE ROAD over QUINNIPIAC RIVER
Built 1957
ROUTE 10 over INTERSTATE 691
Built 1984
ROUTE 10 over QUINNIPIAC RIVER
Built 1994
ROUTE 322 over QUINNIPIAC RIVER
Built 1948
INTERSTATE-691 EB over TEN MILE RIVER
Built 1986
INTERSTATE-691 WB over TEN MILE RIVER
Built 1986
ROUTE 322 over MISERY BROOK
Built 1994
Bridge Details
- Structure #
- 05753
- Year Built
- 1989
- Length
- 11 m (36.1 ft)
- Max Span
- 9.8 m
- Width
- 18.6 m (61 ft)
- Lanes
- 3
- Daily Traffic
- 9,500
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $4,600,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.