ROUTE 10 over INTERSTATE 691

I-691 EXIT 3 · County 009, Connecticut · Built 1984 · 4 Lanes · 14,700 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
05323
Year Built
1984
Length
71.6 m (234.9 ft)
Max Span
39.6 m
Width
20.9 m (68.6 ft)
Lanes
4
Daily Traffic
14,700
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.