ROUTE 10 over ROUTE 322

ROUTE 10 OVER ROUTE 322 · County 003, Connecticut · Built 1936 · 2 Lanes · 4,600 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
00518
Year Built
1936
Reconstructed
1987
Length
18 m (59.1 ft)
Max Span
18 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
4,600
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$4,600,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.