ROUTE 272 over HALL MEADOW BROOK

AT GOSHEN TOWN LINE · County 005, Connecticut · Built 1987 · 2 Lanes · 950 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
05554
Year Built
1987
Length
15.5 m (50.9 ft)
Max Span
15.5 m
Width
11.5 m (37.7 ft)
Lanes
2
Daily Traffic
950
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.