ROUTE 272 over HALL MEADOW BROOK

2.3 MILE NO. OF GOSHEN TL · County 005, Connecticut · Built 1998 · 2 Lanes · 900 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
8
Very Good

Bridge Details

Structure #
02873
Year Built
1998
Length
7.3 m (24 ft)
Max Span
7.3 m
Width
10.9 m (35.8 ft)
Lanes
2
Daily Traffic
900
Material
Concrete
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.