ROUTE 272 over HALL MEADOW BROOK

2.1 MI NORTH OF GOSHEN TL · County 005, Connecticut · Built 2010 · 2 Lanes · 900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
02872
Year Built
2010
Length
16.5 m (54.1 ft)
Max Span
14.5 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
900
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.