I-84 EB OFF RAMP over ROUTE 30 (HARTFORD TPKE)

EXIT 64 · County 013, Connecticut · Built 1981 · 2 Lanes · 7,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
05237
Year Built
1981
Length
35.1 m (115.2 ft)
Max Span
33.5 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
7,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.