I-84 RAMP #253 over INTERSTATE-84

.63 MI E OF MANCHESTER TL · County 013, Connecticut · Built 1982 · 3 Lanes · 13,203 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
05232
Year Built
1982
Length
125.3 m (411.1 ft)
Max Span
64 m
Width
17.6 m (57.7 ft)
Lanes
3
Daily Traffic
13,203
Material
Steel Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.