INTERSTATE-84 EB over ROUTE 30 & 83 (OVERLAP)

0.4 MI E OF MANCHESTER TL · County 013, Connecticut · Built 1982 · 6 Lanes · 53,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
05230
Year Built
1982
Length
54.4 m (178.5 ft)
Max Span
51.8 m
Width
31 m (101.7 ft)
Lanes
6
Daily Traffic
53,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.