LOVERS LANE over COMSTOCK BROOK
300 FT NORTH OF ROUTE 33 · County 001, Connecticut · Built 2024 · 2 Lanes · 420 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
41.195878, -73.437511
This bridge is in worse condition than 13.5% of bridges in County 001. The average bridge in Connecticut is 0 years old; this one is 2 years old.
Nearby Bridges
ROUTE 33 over NORWALK RIVER & MNRR
Built 1940
OLD RIDGEFIELD RD over NORWALK RIVER
Built 1955
US ROUTE 7 over METRO NORTH RAILROAD
Built 1983
US ROUTE 7 over NORWALK RIVER
Built 2008
MIDDLEBROOK FARM R over COMSTOCK BROOK
Built 1944
US ROUTE 7 over GEOTZEN BROOK
Built 1985
RT 106/WOLFPIT RD over METRO-NORTH RAILROAD
Built 1980
RTE 106 (WOLFPIT R over NORWALK RIVER
Built 1996
CANNON ROAD over NORWALK RIVER
Built 1956
ARROWHEAD ROAD over NORWALK RIVER
Built 2024
Bridge Details
- Structure #
- 04975
- Year Built
- 2024
- Length
- 13.6 m (44.6 ft)
- Max Span
- 13 m
- Width
- 7.8 m (25.6 ft)
- Lanes
- 2
- Daily Traffic
- 420
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $4,135,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.