RT 106/WOLFPIT RD over METRO-NORTH RAILROAD

OFF US ROUTE 7 · County 001, Connecticut · Built 1980 · 2 Lanes · 5,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
04342
Year Built
1980
Reconstructed
1996
Length
37.5 m (123 ft)
Max Span
16.5 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
5,900
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.