US ROUTE 7 over GEOTZEN BROOK

1.2 MI N OF ROUTE 33 · County 001, Connecticut · Built 1985 · 2 Lanes · 17,500 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
05477
Year Built
1985
Reconstructed
2011
Length
6.4 m (21 ft)
Max Span
3 m
Lanes
2
Daily Traffic
17,500
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.