ROUTE 154 over FALLS RIVER

0.6 MI S OF ROUTE 9 · County 007, Connecticut · Built 1982 · 2 Lanes · 5,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
04869
Year Built
1982
Length
18.3 m (60 ft)
Max Span
17.4 m
Width
11.2 m (36.7 ft)
Lanes
2
Daily Traffic
5,800
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.