ROUTE 9 RAMP 006 over MUD RIVER

500 FT S OF ROUTE 153 · County 007, Connecticut · Built 1966 · 1 Lanes · 4,405 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
03340
Year Built
1966
Length
6.4 m (21 ft)
Max Span
3 m
Lanes
1
Daily Traffic
4,405
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.