ROUTE 9 NORTHBOUND over ROUTE 153 & ROUTE 154

3.1 MI S OF ROUTE 80 · County 007, Connecticut · Built 1966 · 2 Lanes · 13,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
03342
Year Built
1966
Reconstructed
2016
Length
118.3 m (388.1 ft)
Max Span
45.4 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
13,900
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.