RIVER ROAD over POMPERAUG RIVER
NEAR I-84 EXIT 13 · County 009, Connecticut · Built 1962 · 2 Lanes · 3,800 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
41.439714, -73.251394
This bridge is in worse condition than 36.3% of bridges in County 009. The average bridge in Connecticut is 0 years old; this one is 64 years old.
Nearby Bridges
INTERSTATE 84 WEST over HOUSATONIC RIVER
Built 1977
I-84 EASTBOUND over HOUSATONIC RIVER
Built 1953
RIVER ROAD #1 over INTERSTATE 84
Built 1978
INTERSTATE 84 WEST over CENTER STREET
Built 1977
INTERSTATE 84 EAST over CENTER STREET
Built 1978
INTERSTATE 84 WB over ALPINE DRIVE
Built 1978
INTERSTATE 84 EB over ALPINE DRIVE
Built 1978
BANCROFT ROAD over I-84 & BANCROFT BROOK
Built 1979
SR 816 (GLEN RD) over HOUSATONIC RIVER
Built 1936
ICHABOD ROAD over INTERSTATE 84
Built 1963
Bridge Details
- Structure #
- 04465
- Year Built
- 1962
- Reconstructed
- 2017
- Length
- 56.7 m (186 ft)
- Max Span
- 27.4 m
- Width
- 13.9 m (45.6 ft)
- Lanes
- 2
- Daily Traffic
- 3,800
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $5,248,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.