INTERSTATE 84 WEST over HOUSATONIC RIVER

1.5 MI EAST OF EXIT 11 · County 001, Connecticut · Built 1977 · 2 Lanes · 36,800 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
04180
Year Built
1977
Reconstructed
2022
Length
239 m (784.1 ft)
Max Span
68.3 m
Width
19.5 m (64 ft)
Lanes
2
Daily Traffic
36,800
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$30,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.