I-84 EASTBOUND over HOUSATONIC RIVER

OVER HOUSATONIC RIVER · County 001, Connecticut · Built 1953 · 2 Lanes · 76,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
01218
Year Built
1953
Reconstructed
2023
Length
241.4 m (792 ft)
Max Span
68.3 m
Width
21.7 m (71.2 ft)
Lanes
2
Daily Traffic
76,300
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$30,000,000