ROUTE 69 over INTERSTATE 84

AT EXIT23 INTERSTATE 84 W · County 009, Connecticut · Built 2018 · 5 Lanes · 11,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
04321
Year Built
2018
Length
141 m (462.6 ft)
Max Span
57 m
Width
24.7 m (81 ft)
Lanes
5
Daily Traffic
11,600
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.