I-84 EB EXIT 25 OF over MAD RIVER

1600+/- EAST OF ROUTE 69 · County 009, Connecticut · Built 2018 · 1 Lanes · 5,500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
01224C
Year Built
2018
Length
46.9 m (153.9 ft)
Max Span
44.2 m
Width
8.9 m (29.2 ft)
Lanes
1
Daily Traffic
5,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.