I-84 EB COLLECTOR over WASHINGTON STREET

VICINITY OF EXIT 23 · County 009, Connecticut · Built 1978 · 3 Lanes · 20,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
04320C
Year Built
1978
Length
50.3 m (165 ft)
Max Span
48.2 m
Width
16.7 m (54.8 ft)
Lanes
3
Daily Traffic
20,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.