EAST LIBERTY ST over MAD RIVER

1.0 MILE EAST OF SR 847 · County 009, Connecticut · Built 1907 · 2 Lanes · 3,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
03681
Year Built
1907
Reconstructed
2021
Length
28.7 m (94.2 ft)
Max Span
27.4 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
3,500
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$2,349,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.