BALDWIN STREET #1 over I-84 RAMPS & LOCAL RDS

BETWEEN I84 EXIT 23 & 24 · County 009, Connecticut · Built 1978 · 4 Lanes · 13,400 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
04318
Year Built
1978
Length
166.1 m (544.9 ft)
Max Span
62.8 m
Width
20.9 m (68.6 ft)
Lanes
4
Daily Traffic
13,400
Material
Steel Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.