INTERSTATE-84 EB over RAILS TO TRAILS PATHWAY

0.5 MILE WEST OF EXIT 66 · County 013, Connecticut · Built 2009 · 4 Lanes · 46,100 vehicles/day

Overall
Good
Superstructure
7
Good

Bridge Details

Structure #
04270
Year Built
2009
Length
7 m (23 ft)
Max Span
7 m
Width
34 m (111.5 ft)
Lanes
4
Daily Traffic
46,100
Material
Aluminum, Wrought Iron, or Cast Iron
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.