ROUTE 10 over METRO NORTH RAILROAD

.2 MI N OF EXIT I-95 SB · County 009, Connecticut · Built 1977 · 4 Lanes · 16,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
04008
Year Built
1977
Length
272.5 m (894 ft)
Max Span
25.9 m
Width
21.5 m (70.5 ft)
Lanes
4
Daily Traffic
16,900
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.