HOWARD AVENUE over METRO NORTH RAILROAD

1.0 MILE NORTH OF I 95 · County 009, Connecticut · Built 1920 · 3 Lanes · 7,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
03867
Year Built
1920
Reconstructed
1997
Length
24.1 m (79.1 ft)
Max Span
22.3 m
Width
24.6 m (80.7 ft)
Lanes
3
Daily Traffic
7,100
Material
Steel
Design
Girder and Floorbeam System
Owner
Unknown
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.