INTERSTATE-95 over ROUTE 10

1.5 MILES SOUTH OF I-91 · County 005, Connecticut · Built 1957 · 6 Lanes · 132,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
00164
Year Built
1957
Reconstructed
2015
Length
34.3 m (112.5 ft)
Max Span
32.1 m
Width
41.3 m (135.5 ft)
Lanes
6
Daily Traffic
132,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$47,332,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.