U.S. ROUTE 7 NB & over ROUTE 123

1.8 MILE NORTH OF I-95 · County 001, Connecticut · Built 1970 · 4 Lanes · 26,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
03573A
Year Built
1970
Reconstructed
1990
Length
31.2 m (102.4 ft)
Max Span
29.2 m
Width
26.2 m (86 ft)
Lanes
4
Daily Traffic
26,200
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.