ROUTE 123 over NORWALK RIVER

0.2 MI N OF US ROUTE 7 · County 001, Connecticut · Built 1860 · 5 Lanes · 13,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
01664
Year Built
1860
Reconstructed
2008
Length
34.7 m (113.8 ft)
Max Span
33.1 m
Width
26.7 m (87.6 ft)
Lanes
5
Daily Traffic
13,800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.