US RTE 7 RAMP 005 over US ROUTE 1

1.2 MILES NORTH OF I-95 · County 001, Connecticut · Built 1970 · 1 Lanes · 3,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
03570
Year Built
1970
Length
20.4 m (66.9 ft)
Max Span
18.9 m
Width
8.4 m (27.6 ft)
Lanes
1
Daily Traffic
3,600
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.