US ROUTE 1 over NORWALK RIVER

0.2 MI N OF US ROUTE 7 · County 001, Connecticut · Built 1958 · 4 Lanes · 13,900 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
00318
Year Built
1958
Reconstructed
1997
Length
38.4 m (126 ft)
Max Span
17.1 m
Width
18.4 m (60.4 ft)
Lanes
4
Daily Traffic
13,900
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.