U.S. ROUTE 7 SB over MAPLE STREET

0.7 MILE NORTH OF I-95 · County 001, Connecticut · Built 1970 · 3 Lanes · 27,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
03567B
Year Built
1970
Length
17.4 m (57.1 ft)
Max Span
15.9 m
Width
16.3 m (53.5 ft)
Lanes
3
Daily Traffic
27,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.