ROUTE 8SB OFF RAMP over NORTH WASHINGTON AVENUE

0.1 MI S OF EXIT 3 · County 001, Connecticut · Built 1969 · 2 Lanes · 10,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
03556
Year Built
1969
Length
17.4 m (57.1 ft)
Max Span
15.9 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
10,100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.