ROUTE 8 SB RAMP 00 over MAIN STREET NO. 3

ROUTE 8 SB EXIT 3 · County 001, Connecticut · Built 1970 · 1 Lanes · 5,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
03550
Year Built
1970
Reconstructed
1994
Length
16 m (52.5 ft)
Max Span
14.2 m
Width
8.4 m (27.6 ft)
Lanes
1
Daily Traffic
5,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.