ROUTE 8 SOUTHBOUND over MAIN STREET NO. 3 NB

1.5 MI. NORTH OF I-95 · County 001, Connecticut · Built 1970 · 3 Lanes · 44,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
03549
Year Built
1970
Reconstructed
1994
Length
20 m (65.6 ft)
Max Span
17.1 m
Width
16.9 m (55.4 ft)
Lanes
3
Daily Traffic
44,200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.