ROUTE 8 SOUTHBOUND over NAUGATUCK RIVER & R.R.

.1 MI NORTH OF EXIT 38 · County 005, Connecticut · Built 1966 · 3 Lanes · 14,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
03351
Year Built
1966
Reconstructed
1994
Length
180.4 m (591.9 ft)
Max Span
36.3 m
Width
16.3 m (53.5 ft)
Lanes
3
Daily Traffic
14,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.