SR 848 (WATERBURY over NAUGATUCK RIVER & RR

OFF EXIT 38 ROUTE 8 · County 005, Connecticut · Built 1928 · 2 Lanes · 2,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
00603
Year Built
1928
Reconstructed
2015
Length
148.6 m (487.5 ft)
Max Span
55 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
2,500
Material
Concrete
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.