ROUTE 8 NORTHBOUND over U. S. ROUTE 6 EASTBOUND

.1 MI NORTH OF ROUTE 254 · County 005, Connecticut · Built 1966 · 2 Lanes · 12,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
03349
Year Built
1966
Length
30.8 m (101 ft)
Max Span
29.3 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
12,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.