I-91 NB RAMP 138 over MILL RIVER

I-91 NB EXIT NO. 5 · County 009, Connecticut · Built 1965 · 1 Lanes · 11,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
03014B
Year Built
1965
Length
46.3 m (151.9 ft)
Max Span
23.7 m
Width
9.6 m (31.5 ft)
Lanes
1
Daily Traffic
11,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.