I-91 NB RAMP 141 over I-91 NB RAMP 140

I91 NB OFF RAMP TO WILLOW · County 009, Connecticut · Built 1965 · 1 Lanes · 4,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
03014C
Year Built
1965
Length
26.2 m (86 ft)
Max Span
25.3 m
Width
13.3 m (43.6 ft)
Lanes
1
Daily Traffic
4,300
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.