I-91 SB & RAMP #13 over EAST STREET

1.2 MI N I-95 · County 009, Connecticut · Built 1965 · 5 Lanes · 69,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
03091
Year Built
1965
Length
32.3 m (106 ft)
Max Span
30.2 m
Width
24.9 m (81.7 ft)
Lanes
5
Daily Traffic
69,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.