ROUTE 15 NB over INTERSTATE-91 & TR 3

ADJ TO EXIT#68 TO I691 WB · County 009, Connecticut · Built 1964 · 3 Lanes · 28,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
01825
Year Built
1964
Reconstructed
1988
Length
99.1 m (325.1 ft)
Max Span
38.1 m
Width
16.9 m (55.4 ft)
Lanes
3
Daily Traffic
28,900
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.