INTERSTATE-691 EB over SPOON SHOP BROOK

0.2 MI W OF ROUTE 66 · County 009, Connecticut · Built 1965 · 2 Lanes · 22,500 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
01840
Year Built
1965
Length
7.6 m (24.9 ft)
Max Span
3.7 m
Lanes
2
Daily Traffic
22,500
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.