ROUTE 15 RAMP 148 over WILLOW BROOK

.2 MILES N. OF E. MAIN ST · County 009, Connecticut · Built 1964 · 2 Lanes · 5,600 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
01823
Year Built
1964
Length
9.4 m (30.8 ft)
Max Span
4.3 m
Lanes
2
Daily Traffic
5,600
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.