COLUMBUS BOULEVARD over SR 598 (WHITEHEAD HWY)

0.5 MI S OF I-84 OVERPASS · County 003, Connecticut · Built 2005 · 6 Lanes · 16,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
01629
Year Built
2005
Length
29.6 m (97.1 ft)
Max Span
27.4 m
Width
27.6 m (90.6 ft)
Lanes
6
Daily Traffic
16,100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.