SR 598 WESTBOUND over CT SOUTHERN RAILROAD

EXIT 29A OFF I-91 NB · County 003, Connecticut · Built 1964 · 2 Lanes · 7,900 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
01469D
Year Built
1964
Length
252.9 m (829.7 ft)
Max Span
24.4 m
Width
14.5 m (47.6 ft)
Lanes
2
Daily Traffic
7,900
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.