INTERSTATE 84 EB over STILL RIVER

I-84 EB EXIT 8 · County 001, Connecticut · Built 1962 · 4 Lanes · 48,900 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
01198
Year Built
1962
Reconstructed
1993
Length
40.2 m (131.9 ft)
Max Span
19.8 m
Width
19.5 m (64 ft)
Lanes
4
Daily Traffic
48,900
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.